The upstairs is insulated and dry walled. They start tapping today and should be completed by next Wednesday. We'll be going into town to pick our texture style soon.
A slight change of plans, nothing new here. We weren't able to insulate and dry wall the downstairs due to a bit of a flooding problem. That was caused by the spring thaw running toward the house; we weren't able to do the finish grade before everything froze. We have two pipes that come through the cement stem walls that are leaking. It's fixable, but not until the ground thaws out and we can dig down to the pipes. In the mean time, we just keep sucking up the water and mud.
Stairway to the daylight basement, no problems here
Stay tuned.
1 comment:
looks great! i'm sure you're so excited!!!!!!!
Post a Comment